9978926286,click to call
Join Zoom Meeting
100% Payment by Cheque

Dholera Smart City Project Detail

Dholera Metro City-5009, Booking Open
Dholera Metro City-5009, Booking Open
Dholera Metro City-5008, Booking Open
Dholera Metro City-5007, Booking Open
Dholera Metro City-5006, Booking Open
Dholera Metro City-5005, Booking Open
Dholera Metro City-5004, Booking Open
Dholera Metro City-5003, Booking Open
Dholera Metro City-5002, Sold Out
Dholera Metro City-5001, Sold Out
Dholera Metro City-4, Booking Open
Dholera Metro City-3, Sold Out
Dholera Metro City-2, Sold Out
Dholera Metro City-1, Sold Out
DMC live booking status, Booking Open

BREAKING NEWS FOR DHOLERA

Under the Leadership of Chief Minister, Gujarat’s Tech Landscape Achieves a New Milestone

Under the Leadership of Chief Minister, Gujarat’s Tech Landscape Achieves a New Milestone

14th Nov 2024  Source by https://cmogujarat.gov.in/

The construction of the 109-kilometer expressway linking Ahmedabad with the smart city of Dholera is advancing swiftly, with approximately 80% of the work complete. Expected to become operational by early 2025, the, built at a cost of Rs. 4,373 crores, will reduce travel time between the two cities to just 40 to 45 minutes.......

Read More News Dholera SIR

Nearly 80% of Ahmedabad – Dholera expressway work complete; expected to open in 2025

Nearly 80% of Ahmedabad – Dholera expressway work complete; expected to open in 2025

7th Nov 2024  Source by https://deshgujarat.com/

The construction of the 109-kilometer expressway linking Ahmedabad with the smart city of Dholera is advancing swiftly, with approximately 80% of the work complete. Expected to become operational by early 2025, the Ahmedabad-Dholera Expressway, built at a cost of Rs. 4,373 crores, will reduce travel time between the two cities to just 40 to 45 minutes........

Read More News Dholera SIR

Tata, PSMC sign pact for Rs 91,000-cr Dholera chip plant; meet PM Modi to discuss semiconductor manufacturing

Tata, PSMC sign pact for Rs 91,000-cr Dholera chip plant; meet PM Modi to discuss semiconductor manufacturing

27th Sept 2024  Source by https://www.businesstoday.in/

Prime Minister Narendra Modi met the leadership team of Tata Sons and PSMC to discuss semiconductor manufacturing projects in the country. This comes as Tata Electronics concluded an agreement with the Taiwanese powerchip company for technology support to the tech major’s Dholera wafer fab........

Read More News Dholera SIR

Tata begins training employees for Gujarat chip plant

Tata begins training employees for Gujarat chip plant

26th Sept 2024  Source by https://www.hindustantimes.com/

Tata Electronics has partnered with Taiwan’s chip major Powerchip Semiconductor Manufacturing Corporation to build the fab at Dholera Special Investment Region. Tata Electronics has begun training employees in Taiwan for its $11-billion semiconductor fabrication facility in Gujarat, .......

Read More News Dholera SIR

Our Strength

15

Project Sold Out

7000

+

Family Members Served

59810

Sq Yard Project Area

538293

Sq Feet Area Sold Out

500

+

Cities world wide Addressing Our Investors

15

Year of Experience

314

+

Channel Partners

Live Work Progress Dholera Metro City

DHOLERA SMART CITY PHOTO GALLERY


Featured in

Dholera Smart City Project

Dholera SIR Mega Projects
Dholera SIR Mega Projects
Dholera SIR Mega Projects

Dholera Metro City Residential Plots

Dholera is a town situated in Gujarat, is the joint venture of Gujarat Govt. and central Government. Strategically located the Ahmedabad-Dholera industrial region lies within 100 km from Dedicated Freight Corridor(DFC) in Southern Gujarat.

Central Spine Road (Sh6)

The Gujarat State Road Development Corporation Limited (GSRDC) is developing an access controlled expressway Between Ahmedabad & DSIR to Serve as a Central Spine Road for Dholera. he proposed road would serve as central spine for Ahmedabad-Dholera. It is decided that initially the road will be four lane with six lane structure. It could be access controlled.

The road is supposed to connect the Ahmedabad city on one hand and Dholera Smart City and Bhavnagar ports on the other side. It is envisaged that the new industry cluster to be developed along the spine would considerably benefit with central linkage. It will also act as catalyst to other developments in the region in general and that of SIR in particular. This is also a part of master plan submitted to central govt. for DMIC road connectivity. This is approved by the central govt.

Dholera Metro Train (MRTS)

In Metro rail the distance between Gandhinagar-Ahmedabad-Dholera Smart City is to be covered in two trenches from Gandhinagar to Ahmedabad and from Ahmedabad to Dholera. It is about 100 kms and is proposed as elevated metro. This will provide faster movement and even otherwise important for new international air port. The project is having a longer gestation period and requires to be taken up quickly. The metro is also approved under DMIC master plan by the central govt.

In one of the meetings with secretary DIPP, during his visit to Gandhinagar it was thought of high speed rail corridor on this route. It is related to pre- feasibility study being carried out by the ministry of railways for Pune-Mumbai-Ahmedbad high speed rail corridor. The govt. of Gujarat has requested the MoR to check up the possibility to extend it upto Dholera Smart City via GIFT near Gandhinagar.

In the meantime the study work has been assigned to IL&FS by GIDB for Metro rail. In fact on 29th August 2008, GIDB has re-appointed IL&FS Infrastructure development Corporation for undertaking project advisory services for the Ahmedabad Metro project with the scope of services leading to selection of concessionaire. Again, on 1st September 2008, GIDB also appointed Delhi Metro Rail Corporation for consultancy services for preparing the Detailed Project Report for the Ahmedabad Metro Extension from Gandhinagar to GIFT city.

Dholera International Airport

  • New International Airport on the Northern tip, 1 Kms away of SIR
  • 9200 hectors Government land reserved by State Govt of Gujarat
  • DPR under preparation by Airport Authority of India
  • Site Suitability estabilished by Airport Authority of India
  • SPV has been formed by GoG
  • Cargo as well as passenger Airport facility will be available

The existing airport of Ahmedabad has emerged as one with highest annual growth in traffic and will get saturated much before the year 2020. The expansion of Ahmedabad airport is difficult due to various reasons. Under the circumstances, a new international airport is required to cater the future traffic.

While assessing the potential and requirements of the Dholera Smart City, Government envisaged a tremendous need for a Greenfield International Airport in its vicinity. The level of economic activities in the SIR backed by enormous domestic and foreign investment shall need a world class modern International Airport in this region. Therefore state has included the development of an International Airport in the list of “Early Bird Projects” in consultation with Department of Industrial Promotion and Policy. GoG has also signed an MoU with the Delhi Metro Industrial Corridor Development Company in this regard.

Dholera SIR Mega Projects
Dholera SIR Mega Projects
Dholera SIR Mega Projects

Dholera Smart City- India's PM Narendra Modi's Dream Project

Dholera Smart City is a major project under the DMIC Project with an aim to make it a global manufacturing hub supported by world class infrastructure. Dholera is 1st SIR within high impact Delhi-Mumbai Industrial Corridor (DMIC)

The vision of Dolera is "The Development Plan, taking into account the DMIC objectives and goals, should focus towards creating and enabling environment to protect local industries, enhance investment climate, improve quality of life, upgrade human skills, create world class infrastructure and attract global investment".

Project goals are to double the employement potential, triple industrial output and quadruple exports from the region in next five years.

The Dholera SIR (Special Investment Region) will broadly comprise of various zones including residential, commercial, financial, manufacturing, processing, entertainment and institutional and others in addition to the world class infrastructure in terms of road, water, sanitation and other facilities.

Dholera Smart City is a India-Japanese joint initiative that are proposed to build a -Mini-Japan Township.

Moreover the schemes comprises all modern amenities & excellent infrastructure design with Prime lowest Price & EMI option with flexible time duration.

Invest at India's first biggest planned smart city Dholera Residential plots and a special investment region with Most trusted developer in Government approved project now. Multiple Investment Opportunities for Partner/Investors for launching new project Dholera Metro City - 5005, Residential Plots Project in Dholera Smart City. Promoted by group of top real estate developer, this project will be a unique smart city with no parallel in the world

The major highlights of Dholera Smart City

  • Dream Project of Mr. Narendra Modi envisaged when he was the Chief Minister of Gujarat.
  • Identified as the first Smart City of India.
  • To be developed 2 times the size of Delhi and Six times that of Shanghai.
  • Rated by Forbes as one of its kind cities in India and one amongst Top 12 fastest growing cities in the world.
  • A Special Investment node along the DMIC corridor making it a site for fast track trading and manufacturing activities.
  • Development plans undertaken jointly by Gujarat State Government and Central Government.
  • Excellent connectivity through rail, road, express highway, international airport, metro and port which collectively links the city on both national and global front.
  • Initial funding of Rs. 3,000 crore received from government which shall result in attracting FDI's and private investors.
  • Availability of abundant land at lower valuation makes it a value proposition for retail and international investors.
  • First choice for smart investors owing to its strategic location, current prices and thrust from the government.
  • By and large, it is very much advised by experts who are observing Dholera Real Estate markets very closely that investing in Dholera at present will surely yield very good retu
  • World-class 250 Mt wide 10 Lane Central spine express way
  • High Speed Metro Rail and BRTS to link SIR with mega cities
  • Dholera International Airport with Cargo facility
  • Connected with Kalpsar dam & Bharuch-Bhavnagar Ferry Service
  • Sea Port in the vicinity
  • Proximity to mega cities: Ahmedabad, Bhavnagar, Vadodara
  • Partner Countries: USA, UK, Singapore, France, China, Korea etc.
  • Close to Gujarat International Finance Tech (GIFT) city
  • International level Smart Networking plan ICT completed by CISCO
  • Major Investor-CISCO, IBM, USEL,Mitshubishi, Hitachi, Mahindra etc.
  • Sea Pipavav Port in the vicinity - Best for doing business / trades
  • Benefit of sea coast, nature park, golf course
  • Logistic support of the Dedicated Freight Corridor (DFC).
  • Capable to cater to both International & Domestic Market
  • Close to Petro-chemicals & Petroleum Investment Region (PCPIR)
  • Reshaping of irregular shaped plot is completed in FP (Final Plot).

Dholera Smart City Project

Dholera SIR Mega Projects

Dholera Metro City Residential Plots

Dholera is a town situated in Gujarat, is the joint venture of Gujarat Govt. and central Government. Strategically located the Ahmedabad-Dholera industrial region lies within 100 km from Dedicated Freight Corridor(DFC) in Southern Gujarat.

The Gujarat State Road Development Corporation Limited (GSRDC) is developing an access controlled expressway Between Ahmedabad & DSIR to Serve as a Central Spine Road for Dholera. he proposed road would serve as central spine for Ahmedabad-Dholera. It is decided that initially the road will be four lane with six lane structure. It could be access controlled.

The road is supposed to connect the Ahmedabad city on one hand and Dholera Smart City and Bhavnagar ports on the other side. It is envisaged that the new industry cluster to be developed along the spine would considerably benefit with central linkage. It will also act as catalyst to other developments in the region in general and that of SIR in particular. This is also a part of master plan submitted to central govt. for DMIC road connectivity. This is approved by the central govt.

In Metro rail the distance between Gandhinagar-Ahmedabad-Dholera Smart City is to be covered in two trenches from Gandhinagar to Ahmedabad and from Ahmedabad to Dholera. It is about 100 kms and is proposed as elevated metro. This will provide faster movement and even otherwise important for new international air port. The project is having a longer gestation period and requires to be taken up quickly. The metro is also approved under DMIC master plan by the central govt.

In one of the meetings with secretary DIPP, during his visit to Gandhinagar it was thought of high speed rail corridor on this route. It is related to pre- feasibility study being carried out by the ministry of railways for Pune-Mumbai-Ahmedbad high speed rail corridor. The govt. of Gujarat has requested the MoR to check up the possibility to extend it upto Dholera Smart City via GIFT near Gandhinagar.

In the meantime the study work has been assigned to IL&FS by GIDB for Metro rail. In fact on 29th August 2008, GIDB has re-appointed IL&FS Infrastructure development Corporation for undertaking project advisory services for the Ahmedabad Metro project with the scope of services leading to selection of concessionaire. Again, on 1st September 2008, GIDB also appointed Delhi Metro Rail Corporation for consultancy services for preparing the Detailed Project Report for the Ahmedabad Metro Extension from Gandhinagar to GIFT city.

Dholera SIR Mega Projects
  • New International Airport on the Northern tip, 1 Kms away of SIR
  • 9200 hectors Government land reserved by State Govt of Gujarat
  • DPR under preparation by Airport Authority of India
  • Site Suitability estabilished by Airport Authority of India
  • SPV has been formed by GoG
  • Cargo as well as passenger Airport facility will be available

The existing airport of Ahmedabad has emerged as one with highest annual growth in traffic and will get saturated much before the year 2020. The expansion of Ahmedabad airport is difficult due to various reasons. Under the circumstances, a new international airport is required to cater the future traffic.

While assessing the potential and requirements of the Dholera Smart City, Government envisaged a tremendous need for a Greenfield International Airport in its vicinity. The level of economic activities in the SIR backed by enormous domestic and foreign investment shall need a world class modern International Airport in this region. Therefore state has included the development of an International Airport in the list of “Early Bird Projects” in consultation with Department of Industrial Promotion and Policy. GoG has also signed an MoU with the Delhi Metro Industrial Corridor Development Company in this regard.

Dholera SIR Mega Projects
Dholera SIR Mega Projects
Dholera SIR Mega Projects

Dholera Smart City is a major project under the DMIC Project with an aim to make it a global manufacturing hub supported by world class infrastructure. Dholera is 1st SIR within high impact Delhi-Mumbai Industrial Corridor (DMIC)

The vision of Dolera is "The Development Plan, taking into account the DMIC objectives and goals, should focus towards creating and enabling environment to protect local industries, enhance investment climate, improve quality of life, upgrade human skills, create world class infrastructure and attract global investment".

Project goals are to double the employement potential, triple industrial output and quadruple exports from the region in next five years.

The Dholera SIR (Special Investment Region) will broadly comprise of various zones including residential, commercial, financial, manufacturing, processing, entertainment and institutional and others in addition to the world class infrastructure in terms of road, water, sanitation and other facilities.

Dholera Smart City is a India-Japanese joint initiative that are proposed to build a -Mini-Japan Township.

Moreover the schemes comprises all modern amenities & excellent infrastructure design with Prime lowest Price & EMI option with flexible time duration.

Invest at India's first biggest planned smart city Dholera Residential plots and a special investment region with Most trusted developer in Government approved project now. Multiple Investment Opportunities for Partner/Investors for launching new project Dholera Metro City - 5005, Residential Plots Project in Dholera Smart City. Promoted by group of top real estate developer, this project will be a unique smart city with no parallel in the world

Dholera SIR Mega Projects
  • Dream Project of Mr. Narendra Modi envisaged when he was the Chief Minister of Gujarat.
  • Identified as the first Smart City of India.
  • To be developed 2 times the size of Delhi and Six times that of Shanghai.
  • Rated by Forbes as one of its kind cities in India and one amongst Top 12 fastest growing cities in the world.
  • A Special Investment node along the DMIC corridor making it a site for fast track trading and manufacturing activities.
  • Development plans undertaken jointly by Gujarat State Government and Central Government.
  • Excellent connectivity through rail, road, express highway, international airport, metro and port which collectively links the city on both national and global front.
  • Initial funding of Rs. 3,000 crore received from government which shall result in attracting FDI's and private investors.
  • Availability of abundant land at lower valuation makes it a value proposition for retail and international investors.
  • First choice for smart investors owing to its strategic location, current prices and thrust from the government.
  • By and large, it is very much advised by experts who are observing Dholera Real Estate markets very closely that investing in Dholera at present will surely yield very good retu
  • World-class 250 Mt wide 10 Lane Central spine express way
  • High Speed Metro Rail and BRTS to link SIR with mega cities
  • Dholera International Airport with Cargo facility
  • Connected with Kalpsar dam & Bharuch-Bhavnagar Ferry Service
  • Sea Port in the vicinity
  • Proximity to mega cities: Ahmedabad, Bhavnagar, Vadodara
  • Partner Countries: USA, UK, Singapore, France, China, Korea etc.
  • Close to Gujarat International Finance Tech (GIFT) city
  • International level Smart Networking plan ICT completed by CISCO
  • Major Investor-CISCO, IBM, USEL,Mitshubishi, Hitachi, Mahindra etc.
  • Sea Pipavav Port in the vicinity - Best for doing business / trades
  • Benefit of sea coast, nature park, golf course
  • Logistic support of the Dedicated Freight Corridor (DFC).
  • Capable to cater to both International & Domestic Market
  • Close to Petro-chemicals & Petroleum Investment Region (PCPIR)
  • Reshaping of irregular shaped plot is completed in FP (Final Plot).
To download free report on India's First Planned city (Dholera Special Investment Region), Project Brief, The Development Strategy The phasing Strategy, Land Use Proposals, Transports, Utilities, Environmental assessment, social assessment, implementation & regulatory frameworks, Broad cost estimates, benefits from DSIR, Development Plan etc, GDCR, Land Use proposal Just share the link

I want to know Discount offer

Name :

Mobile :

E-mail :



Join Zoom Meeting